Archive Post
Home / ash
Kenya: How Toxic and Infectious Medical Waste Can Be Harming Citizens
A visit to the hospital does not usually show what happens in the trunk. It…
The other day at the waste incineration plant
From waste is made electricity for 250,000 individuals And this is the highlight. The heat…
hot medical waste disposing machine, Operation Condition: 8-16 hr/ day
hot medical waste disposing machine, Operation Condition: 8-16 hr/ day Control: Built-in data recording Operating temperature: Incinerator /Primary Combustion Chamber Primary Chamber: 900 – 1200 0C Type: horizontal/vertical Temperature: 1200- 1300 oC Residence time of gases : >2 seconds Ash Residue: <5% of original waste size Ash Handling System: Both Automatic and manual removal of Ash. Must ensure removal/treatment of hazardous remnants of ash Flue gas treatment system : Capable of treating the flow of flue gas as the incinerator is operating at its maximum capacity Auxiliary device: Water level gauge, pressure sensor, PH sensor..etc Auxiliary device: Fuel cut-off device Waste feeding mechanism: Automatic pneumatic/hydraulic waste loading system or conveyor belt , capacity 650-800 L at a time Chimney (Stack):…
Burnaby garbage incinerator operator sued over pollution concerns
The Greater Vancouver Sewerage and Drainage District is suing Maxxam Analytics International Corp. and Covanta…
hot medical waste disposing machine, Operation Condition: 8-16 hr/ day
hot medical waste disposing machine, Operation Condition: 8-16 hr/ day Control: Built-in data recording Operating temperature: Incinerator /Primary Combustion Chamber Primary Chamber: 900 – 1200 0C Type: horizontal/vertical Temperature: 1200- 1300 oC Residence time of gases : >2 seconds Ash Residue: <5% of original waste size Ash Handling System: Both Automatic and manual removal of Ash. Must ensure removal/treatment of hazardous remnants of ash Flue gas treatment system : Capable of treating the flow of flue gas as the incinerator is operating at its maximum capacity Auxiliary device: Water level gauge, pressure sensor, PH sensor..etc Auxiliary device: Fuel cut-off device Waste feeding mechanism: Automatic pneumatic/hydraulic waste loading system or conveyor belt , capacity 650-800 L at a time Chimney (Stack):…
Texas Ebola waste Won’t Be disposed in Louisiana
On Friday Attorney General Buddy Caldwell declared the State of Louisiana reached an arrangement with…
Supply, Installation and Commissioning of DIESEL FIRED INCINERATORS
Supply, Installation and Commissioning of DIESEL FIRED INCINERATORS Medical Waste Incinerator, 100 to 120 Kg/hr Application For incineration, general and pathological Capacity 100 C 120 kg/h burn rate Type Two combustion chambers type; primary and Secondary, controlled/forced combustion air type with a flue gas emission scrubbing unit Operating time Minimum 8 hours daily Operating temperature From 850 0C to 1200 0C, Automatic controlled Residual Ash 5 to 10% Construction…
Supply, Installation and Commissioning of DIESEL FIRED INCINERATORS
Supply, Installation and Commissioning of DIESEL FIRED INCINERATORS Medical Waste Incinerator, 100 to 120 Kg/hr Application For incineration, general and pathological Capacity 100 C 120 kg/h burn rate Type Two combustion chambers type; primary and Secondary, controlled/forced combustion air type with a flue gas emission scrubbing unit Operating time Minimum 8 hours daily Operating temperature From 850 0C to 1200 0C, Automatic controlled Residual Ash 5 to 10% Construction…