Archive Post

Incinérateur PLC (TS50 PLC)

Informations de base. N ° de Modèle: TS50 PLC Sources de pullution: traitement des déchets…

50-100-150-200 Kgs per Hour Solid Waste Incinerator Model TS150 PLC 1570Liters Chamber

Waste Incinerator Model TS150 PLC, Overview This model is small-scale waste incineration equipment for small…

medical incinerator

medical incinerator is incineration equipment for the waste from hospital, clinic,laboratory or other related department.…

medical incinerator

medical incinerator is incineration equipment for the waste from hospital, clinic,laboratory or other related department.…

Controlled air medical waste incinerator designed for incineration of bio-medical waste

Controlled air medical waste incinerator designed for incineration of bio-medical waste generated at a blood-processing center. The waste to be treated mainly includes bio-waste (i.e. bodily fluids), infectious and hazardous waste such as syringes, needles, and other medical waste (i.e. silicon rubbers, plastic, textiles, papers, packs, etc.) Operational Specs Physical Specs Combustion Chamber Volume (m3) 8.80m3 Burn Rate* up to 1,500kg per hour Average Fuel Consumption 65 kg per hour or more (7 diesel burners) Operational Temperature 850 – 1320°C Gas Retention in Secondary Chamber Large secondary chamber    …

pet incinerator for sale

pet incinerator for sale: The pet cremation equipment humanized design with movable platform, small space…

large animal incinerators

Animal diseases, new virus strains and spread of infectious diseases are only few of the…

Controlled air medical waste incinerator designed for incineration of bio-medical waste

Controlled air medical waste incinerator designed for incineration of bio-medical waste generated at a blood-processing center. The waste to be treated mainly includes bio-waste (i.e. bodily fluids), infectious and hazardous waste such as syringes, needles, and other medical waste (i.e. silicon rubbers, plastic, textiles, papers, packs, etc.) Operational Specs Physical Specs Combustion Chamber Volume (m3) 8.80m3 Burn Rate* up to 1,500kg per hour Average Fuel Consumption 65 kg per hour or more (7 diesel burners) Operational Temperature 850 – 1320°C Gas Retention in Secondary Chamber Large secondary chamber    …
wastecos.com